AC Power-Flow & N-1 Screening
for the Eastern Interconnect.

Power systems studies that took overnight runs on legacy desktop tools now complete in minutes. PowerOps is a Python-first engine for AC/DC power-flow, N-1 screening, TrLim, and MIC deliverability on the full Eastern Interconnect — 93,447 buses, standard structured outputs.

Initializing solver…
93,447
Buses solved
Eastern Interconnect
// EI 2024 Summer Peak
<0.001
pu voltage error p99
13/13 contingency gate PASS
// validated vs reference solvers
2,220
N-1 contingencies
screened in ~15 min
// FDNS chord-Newton, ERCOT
0.938
N-1 screening F1 score
ERCOT 2,220-contingency case
// validated vs reference solvers
What It Does

A Full Study Pipeline in One Tool

PowerOps replaces a stack of separate tools with a single Python engine that reads industry-standard RAW network files and produces structured study reports.

AC Power Flow

Full Newton-Raphson solver with FDNS (Fast-Decoupled) acceleration. Tap control, PV→PQ flip, remote regulation, and N-1 auto-fallback. Validated against reference power-flow solvers at transmission scale.

dVm max <0.007 pu · p99 <0.001 pu

N-1 Contingency Screening

Branch violation detection across the full contingency list. BranchViol, VoltViol, and CaseSum reports in structured CSV format.

F1 0.938 · ERCOT 2,220-contingency case

Transfer Limit (TrLim)

Proportional transfer limit study using DC sensitivity (DFAX). Validated against reference solvers on ERCOT 901→904 transfer path.

DFAX median 1.000 · ERCOT 901→904 path

ATC / AFC

Available Transfer Capability end-to-end: TTC − TRM − CBM − ETC. Full pipeline — source area, sink area, and posted path in one command.

Full ATC pipeline · CLI + REST

MIC Deliverability

Batch maximum-deliverable capacity screening for interconnection queues. DC (SCED) + AC verify mode. Full EI in under 50 seconds via HTTP API.

Full EI 48.9 s via HTTP

N-1 Overload Map

Geographic visualization of worst-case contingency loading. Per-contingency drill-down panel, kV filter, and real bus locations on the Eastern Interconnect topology.

345 kV+ · 93,447 bus locations
Workflow

From RAW File to Report

PowerOps plugs into the network model files you already have. No model conversion, no new network build.

01

Load Your Model

Point PowerOps at any v29–v36 RAW network file. Bus, branch, load, generation — parsed automatically with full floating-point fidelity.

powerops serve --study-raw ei_2024.raw
02

Run Studies

AC power-flow, N-1 contingency screen, TrLim, MIC deliverability — each accessible via CLI command or REST API. Chain them in a single script.

powerops n1map-precompute --min-kv 345
03

Export Reports

Outputs are structured CSV — drop them directly into your existing review and QA workflow. BranchViol, VoltViol, TrLim, CaseSum, and more.

→ BranchViol.csv · TrLim.csv · CaseSum.csv
Open Demo — Zero CEII

N-1 Overload Map — ACTIVSg70k Eastern Interconnect

Publicly available synthetic 70,000-bus EI case with real US geography.
22 violations · 22 contingencies at 345+ kV, 100% thermal rating threshold. Hover a branch for details.

100–125% loading 125–150% 150%+·70 k-bus background network shown
BranchkVWorst ContingencyBase%N-1%
28467-2846634528466 28475 117.9%165.4%
46448-4644734546340 46447 120.2%154.1%
36915-3691434536426 36914 138.0%150.2%
28284-2828334528283 28292 147.5%148.5%
36828-3682734536827 36839 142.6%130.9%
30304-3031034530322 30304 169.2%128.2%
28510-2850934528509 28519 159.5%127.1%
29768-3001334529761 29768 120.0%124.3%
59918-5976834559774 59926 131.4%117.3%
13898-1389734513897 13908 148.2%116.9%
27825-2784134527110 27113 141.0%111.1%
25613-2561234525612 25616 147.6%111.1%
30304-6076634530975 30900 190.9%106.7%
60575-6076634560783 60575 175.6%104.5%
30806-30903 c234530806 30903 157.1%104.3%
30806-30903 c134530806 30903 257.1%104.3%
34049-32777 c234534049 32777 166.4%102.7%
34049-32777 c134534049 32777 266.4%102.7%
30912-3058534530946 30585 161.6%102.1%
23077-2362534523535 23077 164.3%101.2%
30946-3058534530912 30585 157.7%101.1%
28603-2993334529692 28589 162.1%100.8%
Live Demo

Try It Now — No Sign-In Required

The public demo runs on publicly available synthetic networks — the IEEE 118-bus case and the ACTIVSg70k Eastern Interconnect (70,000 buses, full EI geography, zero CEII). Same engine, real scale, no sensitive data.

PowerOps — IEEE 118-bus AC Power Flow

The full Eastern Interconnect demo (93,447 buses) requires approved access — request it below →

Access

CEII-Aware Access Model

Real transmission network data is FERC CEII-sensitive. PowerOps is designed for CEII-sensitive workflows with a three-tier access model.

Tier 1 — Public

Open Demo

No sign-in. IEEE 118-bus test case. Full solver and N-1 screen in the browser, right now.

  • IEEE 118-bus AC power flow
  • N-1 contingency screen
  • Transfer limit (TrLim)
  • No account required
Try Demo Now
Tier 3 — CEII

Real Case Access

Executed FERC CEII NDA on file. Full named topology — EI 2024 or ERCOT study case.

  • Full named transmission topology
  • Named substations and bus IDs
  • CEII NDA (FERC standard template)
  • SPP / MISO / ERCOT study cases
Contact for NDA

Request Beta Access

Tier 2 (regional case) requires organizational context. We review requests within 2 business days and respond to your work email.

CEII note: Tier 3 access requires an executed FERC CEII NDA (standard template). We will send the NDA to your work email after reviewing your Tier 2 request.