Capacity Expansion Demo

Interactive results from a 440-bus ISO New England planning study

A capacity expansion study you can interrogate

Most planning studies arrive as a PDF and a spreadsheet. This one is a live model of a real system — an ISO New England footprint reduced to 440 buses — where every result can be traced back to the assumptions that produced it.

Full-factorial scenario matrix

Load, renewable siting, and carbon target varied independently — every combination solved to optimality, not a handful of hand-picked cases.

Nodal network visualisation

Reduced and full network overlays on real geography, with transmission corridors routed along physical paths rather than drawn as straight lines.

Side-by-side comparison

Any two scenarios diffed across cost, capacity mix, dispatch, and transmission build — with the drivers surfaced, not just the deltas.

Cost decomposition

Investment, fixed and variable O&M, fuel, carbon, and unserved energy separated so the tradeoff behind a number is visible.

Reliability diagnostics

Load shedding traced to its cause — distinguishing genuine supply shortfall from deliverability limits imposed by siting and network constraints.

Hourly dispatch

Chronological dispatch by technology across representative periods, so the capacity mix can be checked against how it actually operates.

56
Scenarios solved
440
Network buses
1,278
Transmission lines
2024–2049
Planning horizon
Access by invitation

Request a walkthrough

The dashboard is shared selectively while the underlying study is active. Get in touch and we will walk you through the results directly.